CENTRAL COMMUNITY

COLLEGE - HASTINGS

KEARNEY BUILDING -

WELDING REMODEL

INSTRUCTIONS TO BIDDERS

INVITATION

1.01 BID SUBMISSION

A. Bids signed and under seal,

executed, dated, and submitted for

the furnishing of all labor, materials,

and equipment for the Central

Community College - Hastings,

Kearney Building - Welding Re-

model prior to:

1. Date: January 3, 2019.

2. Time: 2:00 p.m.

3. Place: Central Community Col-

lege Board Room

4. Location: Grand Island, Ne-

braska.

B. Offers will be opened publicly

immediately after the time for re-

ceipt of bids. The Owner will con-

sider the bids received for the fur-

nishing of said labor, materials and

equipment necessary for the proper

construction of the aforesaid proj-

ect.

C. The General, Mechanical and

Electrical, will be under one Bid. All

subcontractor quotations shall be

sent to the General Contractor.

D. Bid Security is required to be

submitted with bid proposal form.

Make payable to Central Commu-

nity College in the amount of 5% of

the Lump Sum Bid Amount. Bid

Security shall be of cashier's

check, certified check, or Bid Bond

issued by a Surety licensed to con-

duct business in the State of Ne-

braska. Form of Bid Bond is AIA

Document A310. Any agent signing

a bid bond on behalf of the Surety

must attach a Power of Attorney ef-

fectively evidencing the agent's au-

thority to bind the Surety to the

performance of the Bid Bond.

E. Performance Bond: The Con-

tractor shall be required to furnish

acceptable bonds to complete the

work and pay for all labor and ma-

terials used, said bonds to be in the

amount of 100% of total amount of

the Contract. See Document A701,

Instructions to Bidders.

F. Taxes: The Contractor by vir-

tue of his contract with Central

Community College, becomes a

purchasing agent for the Owner on

their behalf and under Statute

77-2702 does not pay sales tax.

G. Insurance: Prior to the start of

the work, completed copies of the

Certificate of Insurance, AIA Docu-

ment G705 shall be submitted to

the Owner and Architect.

H. Pre-Bid Conference is man-

datory for General Contractors.

Meeting attendance is strongly rec-

ommended for major subcontrac-

tors.

1. Date: December 18, 2018.

2. Time: 2:00 p.m.

3. Place: Central Community Col-

lege - Hastings, Kearney Building,

room 101

4. Location: Hastings, NE.

1.02 PROJECT SUMMARY

A. Project Name: Central Com-

munity College - Hastings, Kearney

Building - Welding Remodel.

B. Project Address: 550 South

Technical Blvd, Hastings, Nebraska

68901.

C. Owner's Name: Central Com-

munity College

D. Architect's Name: Wilkins

Architecture Design Planning,

L.L.C..

E. The Contract Documents,

dated December 12, 2018 prepared

for the project by Wilkins Architec-

ture Design Planning, L.L.C.

F. The work consists of an inte-

rior remodel at the existing Kearney

Building on the Central Community

College - Hastings Campus to tem-

porarily relocate the welding pro-

gram. Remodel is minimal in scope

and approximately 5,000 sq. ft.

Project includes minor demolition,

including material that will need to

be removed by a licensed abate-

ment contractor under the General

Contract. New construction in-

cludes an overhead coiling door,

wood dock, interior walls, hollow

metal frames and doors, piping,

minimal mechanical equipment,

and electrical work.

1.03 CONTRACT DESCRIPTION

A. Contract Type: A single prime

contract based on a Stipulated

Price as described in Document 00

5200 - Agreement Form.

B. Project will be constructed un-

der one general construction con-

tract.

1.04 OWNER OCCUPANCY

A. Owner intends to occupy the

Project upon Substantial Comple-

tion.

B. Schedule the Work to accom-

modate Owner occupancy.

1.05 CONTRACT TIME

A. The bidder, in submitting an

offer, accepts the Contract Time

period stated for performing the

Work. The completion date in the

Agreement shall be the Contract

Time added to the commencement

date.

1.06 WORK SEQUENCE

A. ALL WORK MUST BE COM-

PLETED WITHIN THE SCHEDULE

NOTED. The Work shall be con-

ducted in a single phase as de-

scribed in the schedule below:

B. December 18, 2018: Pre-Bid

Conference at 2:00 p.m. at Central

Community College - Hastings,

Kearney Building, room 101

January 3, 2019: Bids received

from General Contractors at 2:00

p.m.

TBD: Contractors interviews in

CCC Board Room.

January 17, 2019: Low bid con-

tractor recommendation presented

to Board of Governors.

January 23, 2019: Contract

awarded.

January 28, 2019: Construction

Starts

April 26, 2019: Substantial Com-

pletion.

May 3, 2019: Final Completion.

BID DOCUMENTS AND

CONTRACT DOCUMENTS

2.01 DEFINITIONS

A. Bid Documents: Contract Doc-

uments including Project Manual,

Construction Drawings and all is-

sued Addendums.

2.02 AVAILABILITY

A. Bid Documents may be ob-

tained from the following location:

1. Standard Digital Imaging, 4424

S 108th St, Omaha, NE 68137 (402)

592-1292.

B. Bid Document Information can

be obtained online from the fol-

lowing location:

1. Standard Digital Imaging |

Standard Share; www.stan-

dardsharev3.com. The following in-

formation can be obtained and

viewed:

a. Instructions to Bidders

b. Bid Form

c. Specifications Table of Con-

tents

d. Section 01 1000 Summary

e. Addendums

f. Construction Drawing Images

IMAGES ARE NOT FOR BIDD-

ING - FOR REFERENCE ONLY IN

ORDERING

C. A deposit in the amount of

$50.00 (made payable to Wilkins

Architecture Design Planning,

L.L.C.) will be required for each set

of bidding documents. If shipping

is required there is a non-refund-

able amount determined and made

payable to Standard Digital Imag-

ing These checks are to be sent to

Standard Digital Imaging prior to

receipt of documents. The deposit

will be returned in full only if a qual-

ified bid is submitted and the Bid

Documents are returned within fif-

teen (15) days of the bid determina-

tion, or if the Contractor decides

not to submit a Proposal and the

Bid Documents are returned with

seven (7) days prior to the bid

opening.

D. ALL BID DOCUMENTS

SHALL BE RETURNED to the of-

fice of Wilkins Architecture De-

sign Planning, L.L.C., 2908 West

39th Street, Suite A, Kearney,

Nebraska, 68845.

2.03 EXAMINATION

A. Bid Documents may be exam-

ined at:

Lincoln Builders Bureau, 5910 S.

58th Suite #C, Lincoln, NE 68516.

Omaha Builders Exchange, 4255

S 94th St., Omaha, NE 68127.

Columbus Area Chamber of

Commerce, 753 33rd Ave., Colum-

bus, NE 68602-0515.

Hastings Builders Bureau, 301

South Burlington, Hastings, NE

68902.

Builders Plan Service, 309 West

2nd, Grand Island, NE 68801.

Reed Construction Data, 30

Technology Drive So. Suite 500,

Norcross, GA 30092.

Kearney Plan Service, 1007 2nd

Avenue, Kearney, NE 68847.

Standard Digital Imaging/Stan-

dardShare - www.stan-

darddigital.com.

Construction Industry Center -

www.construction

industrycenter.com.

iSqFt - www.isqft.com.

Dodge Data & Analytics (Electro-

nic Plan Room), 3315 Central Ave,

Hot Springs, AR 71913

800-393-6343 -

www.construction.com.

B. Upon receipt of Bid Docu-

ments verify that documents are

complete. Notify Architect should

the documents be incomplete.

C. Immediately notify Architect

upon finding discrepancies or

omissions in the Bid Documents.

2.04 PRODUCT/

ASSEMBLY/SYSTEM

SUBSTITUTIONS

A. No technical questions will

be answered by the Architect's/-

Engineer's office(s) during the

twenty-four (24) hours immedi-

ately preceding the bid opening

time and date.

B. All products and manufactur-

ers shall be as specified in the bid

documents. Any requested

changes in products or manufac-

turers shall be submitted to the Ar-

chitect seven days prior to the bid

date. Requested changes that have

been approved will be included in

an addendum. Any requested

changes not included in an adden-

dum are to be considered as not

approved. The Owner reserves the

right to negotiate any proposed

Voluntary Alternates only with the

apparent low bidder with selection

based on the Base Bid and se-

lected Alternate(s).

C. The Architect does not intend

to issue any addenda to the bidd-

ing documents within three (3)

working days of the bid opening

time and date.

SITE ASSESSMENT

3.01SITE EXAMINATION

A. All Bidders are required to

make a careful, close examination

of the entire building areas before

submitting a bid. See 01 1000

Summary for the schedule.

1.4 CONTRACTOR USE OF SITE

AND PREMISES

A. Arrange use of site and prem-

ises to allow:

1. Owner occupancy.

2. Use of site and premises by

the public.

B. Provide access to and from

site as required by law and by

Owner:

1. Emergency Building Exits Dur-

ing Construction: Keep all exits re-

quired by code open during con-

struction period; provide temporary

exit signs if exit routes are tempo-

rarily altered.

2. Do not obstruct roadways,

sidewalks, or other public ways

without permit.

C. Utility Outages and Shutdown:

1. Limit disruption of utility ser-

vices to hours the building is un-

occupied.

2. Do not disrupt or shut down

life safety systems, including but

not limited to fire sprinklers and fire

alarm system, without 7 days' no-

tice to Owner and authorities hav-

ing jurisdiction.

3. Prevent accidental disruption

of utility services to other facilities.

OFFER ACCEPTANCE/

REJECTION

4.01 DURATION OF OFFER

A. Bids shall remain open to ac-

ceptance and shall be irrevocable

for a period of thirty (30) days after

the bid closing date.

4.02 ACCEPTANCE OF OFFER

A. The Owner and Contractor

shall have the right to reject any or

all bids, which are in any way in-

complete or irregular, and to waive

any informality in any proposal.

ZNEZ D4,6,12,14

NOTICE OF MEETINGS

BUFFALO COUNTY BOARD

OF COMMISSIONERS AND

BUFFALO COUNTY BOARD

OF EQUALIZATION

KEARNEY, NEBRASKA

 

NOTICE IS HEREBY GIVEN that

the regular meetings of the Buffalo

County Board of Commissioners

and the Buffalo County Board of

Equalization will be held on Tues-

day, December 11, 2018 at the

Buffalo County Board of Commis-

sioners Board Room located at

1512 Central Ave., Kearney, Ne-

braska.

Said meetings will be open to the

public. The Buffalo County Board

of Commissioners meeting will

begin at 9:00 A.M. and the Buffalo

County Board of Equalization

meeting will begin at 9:45 A.M. A

list of the organizations seeking tax

exemptions, descriptions of the

property and official recommenda-

tions are available in the office of

the County Assessor and/or

County Treasurer.

Accommodations for the disa-

bled are available upon request.

Please contact the ADA Coordina-

tor at 308-236-1224 at least 48

hours prior to the meeting if ac-

commodations are required.

Agendas for said meetings are

kept continuously current at the of-

fice of the Buffalo County Clerk,

but may be modified up to 24 hours

prior to said meetings.

Janice I. Giffin,

Buffalo County Clerk

(SEAL)

ZNEZ D6,t1

LEGAL NOTICE

 

The December 2018 meeting of

the Board of Directors of Nebraska

Public Power District will be held

Wednesday and Thursday, De-

cember 12-13, at NPPD's General

Office, 1414 15th Street, Colum-

bus, Nebraska. NPPD Board com-

mittees will also meet December 12

13, at the Columbus General Of-

fice.

The schedule for NPPD's De-

cember 2018 Board meeting is as

follows:

WEDNESDAY,

DECEMBER 12, 2018

Board Governance (Ad Hoc)

Committee - 3:30 p.m., Board

Room

NPPD Board of Directors Meet-

ing, General Counsel Report - fol-

lowing Board Governance (Ad Hoc)

Committee, Board Room

THURSDAY,

DECEMBER 13, 2018

Budget Committee - 8:30 a.m.,

Board Room

Strategic Planning Committee -

following Budget Committee,

Board Room

Customer and Support Ser-

vices Committee - following Stra-

tegic Planning Committee, Loup

Room

Energy Supply Committee - fol-

lowing Strategic Planning Commit-

tee, Platte Room

Board Strategic Business Ses-

sion - following Customer and

Support Services Committee and

Energy Supply Committee, Board

Room

NPPD Board of Directors Meet-

ing - following Board Strategic

Business Session, Board Room

Nuclear Committee of the

Whole - will meet as part of the

Board of Directors Meeting

Public Comments - 11:00 a.m.,

Board Room

The public will be able to watch a

live video stream of the Board of

Directors Meeting on Thursday,

December 13, by accessing

www.nppd.com/ via computer. The

video stream is expected to begin

at approximately 10:30 a.m. with

the Strategic Business Session;

further schedule updates will be

available on NPPD's website the

morning of December 13. Commit-

tee meetings will not be video

streamed (the Nuclear Committee

is a committee of the whole and

will meet as part of the regular

Board of Directors Meeting).

It is expected that a one-hour

lunch recess will begin at approxi-

mately 12:00 noon on Thursday,

December 13.

It is possible that portions of the

December 12-13, 2018, meetings

will be held in Executive Session.

Agendas for these meetings are

kept continuously current and are

available for public inspection dur-

ing business hours at the office of

the Assistant Secretary at the Co-

lumbus General Office, Columbus,

Nebraska, or online at

www.nppd.com/about-us

/board-of-directors/. The agenda

for the December 13, 2018, meet-

ing includes, among other matters:

(1) consideration of revised rates

for customers being provided

wholesale electric service by NPPD

under the General Firm Power

Service (GFPS) Rate Schedule, the

Buy-Through Program Rate Sched-

ule, the Economic Development

Rate Schedule, the Transmission

Service (T 2) Rate Schedule, or the

Production Cost Adjustment (PCA)

Rate Schedule, which rate sched-

ules are proposed to become ef-

fective for service provided on and

after February 1, 2019; (2) consid-

eration of revised rates for custom-

ers being provided retail electric

service by NPPD, all of which are

proposed to become effective for

service provided on and after either

January 1, 2019 or February 1,

2019, depending on the specific

rate schedule; and (3) consideration

of a Revised 2019 Capital Projects

Budget, which proposed budget is

available for public inspection dur-

ing business hours at the office of

the Assistant Secretary at the Co-

lumbus General Office, Columbus,

Nebraska.

NEBRASKA PUBLIC POWER

DISTRICT

ZNEZ D6,t1

<addr:NCORPE,3085346752,24871 S. LONE STAR ROAD,NORTH PLATTE,NE>

PUBLIC HEARING NOTICE

 

The Nebraska Cooperative Re-

publican Platte Enhancement

(NCORPE) will conduct an Annual

Report Public Hearing on Decem-

ber 12, 2018 at 10:00 am at the

Twin Platte NRD office, 111 South

Dewey Street, North Platte, NE

69101.

All persons having an interest in

these matters are invited to attend

and make their views known at this

time. Further information may be

obtained by contacting the N-CO-

RPEOffice at (308) 534-6752 or at

ncorpe.org.

ZNEZ D3,6,11

<addr:NCORPE,3085346752,24871 S. LONE STAR ROAD,NORTH PLATTE,NE>

REGULAR MEETING NOTICE

 

The Nebraska Cooperative Re-

publican Platte Enhancement

(NCORPE) will conduct its' Regular

Meeting on December 12, 2018 im-

mediately following the conclusion

of the Public Hearing currently

scheduled at 10:00 am. The meet-

ing shall be held at the Twin Platte

NRD office, 111 South Dewey

Street, North Platte, NE 69101.

All persons having an interest in

these matters are invited to attend

and make their views known at this

time. Further information may be

obtained by contacting the N-CO-

RPE Office at (308) 534-6752 or at

ncorpe.org.

ZNEZ D3,6,11

NOTICE

 

The Kearney Housing Agency will

hold a Public Hearing regarding the

Approval and Adoption of the

5-Year Agency Plan and 5-Year

Capital Fund Plan. These docu-

ments are available for review at

the Agency Office located at 2715

Avenue I, Kearney, Nebraska, dur-

ing regular posted hours.

The Public Hearing will be held

on Thursday, December 20, 2018,

at 12:00 P.M. in the Kearney Hous-

ing Agency Conference Room,

2715 Avenue I, Kearney, Nebraska.

The public hearing is open to the

public.

ZNEZ D6,t1

NOTICE

BUFFALO COUNTY BOARD

OF COMMISSIONERS

EMERGENCY MEETING

DECEMBER 3, 2018

 

An Emergency meeting of the

Buffalo County Board of Commis-

sioners was held on Monday, De-

cember 3, 2018 at 4:00 P.M. Chair-

man McMullen called the meeting

to order and led those present in

the Pledge of Allegiance. The fol-

lowing Board members responded

to roll call: Joseph Brayton, Kent

Greder, Ivan Klein, Ronald

Loffelholz, Sherry Morrow, Dennis

Reiter and William McMullen.

Chairman McMullen announced

that in accordance with Section

84-1412 of the Nebraska Revised

Statutes, a current copy of the

Open Meetings Act is available for

review and posted at the back of

the Board Room.

Notice of the meeting was given

to all members of the Board of

Commissioners via telephone.

County Clerk Janice Giffin took all

proceedings hereinafter shown

while said meeting was open to the

public. A copy of the acknowledg-

ment and receipt of notice and

agenda by the Board of Commis-

sioners is attached to these min-

utes. Deputy County Attorney Kari

Fisk and County Assessor Ethel

Skinner were present.

Chairman McMullen stated that

the meeting was called as an emer-

gency for discussion of closing the

County Offices on December 5,

2018 for the National Day of

Mourning to honor former Pres-

ident George H.W. Bush. Deputy

County Attorney Fisk provided two

draft resolutions for their consider-

ation and or modification.

Moved by Brayton and seconded

by Reiter not to close the County

offices on December 5, 2018 but to

encourage all employees to re-

member former President George

H. W. Bush by observing a moment

of silence in his honor at noon

when the funeral service is sched-

uled to commence. Upon roll call

vote, the following Board members

voted "Aye": Brayton, Reiter, and

Loeffelholz. Voting "Nay": Greder,

Klein, Morrow and McMullen. Mo-

tion declared failed.

Moved by Greder and seconded

by Morrow to close the County of-

fices on December 5, 2018 for Na-

tional Day of Mourning to honor

former President George H. W.

Bush with the following Resolution

2018-53. Upon roll call vote, the

following Board members voted

"Aye": Greder, Morrow, Klein and

McMullen. Voting "Nay": Brayton,

Loeffelholz and Reiter. Motion de-

clared carried.

RESOLUTION 2018-53

WHEREAS,

President Donald

Trump has, by executive order, ap-

pointed Wednesday, December 5,

2018, as a National Day of Mourn-

ing to honor former President

George H.W. Bush who passed

away on Friday, November 30,

2018, and;

WHEREAS, Governor Pete Rick-

ets, in accordance with said Presi-

dential order and State law, has

provided the same benefit to State

employees, and;

WHEREAS, the Buffalo County

Board of Commissioners wishes to

join the nation in this National Day

of Mourning and wishes to aid its

employees in their observation of

the National Day of Mourning; and,

WHEREAS, complete closure of

all County functions is not possible

as the State of Nebraska has di-

rected the Court system remain

open for business and other essen-

tial county functions such as law

enforcement functions may not be

suspended;

NOW THEREFORE, BE IT RE-

SOLVED BY THE BUFFALO

COUNTY BOARD OF COMMIS-

SIONERS:

1. That Buffalo County join the

Federal and State government in

observation of Wednesday, De-

cember 5, 2018, as a National Day

of Mourning; and, as such, Decem-

ber 5, 2018 shall be declared a

County holiday.

2. As it relates only to December

5, 2018, Officials shall work

promptly to classify each employee

under their supervision as

"essential" or "nonessential". For

purposes of this resolution

"nonessential" employees shall be

those who can observe this holiday

as scheduled without disruption of

Court, law enforcement, or other

essential services and "essential"

employees shall be those who

must delay their observation of this

Day of Mourning so as to not dis-

rupt Court, law enforcement, or

other essential services. Supervi-

sors shall take reasonable efforts to

notify employees of their classifica-

tion by noon on December 4, 2018.

3. All nonessential employees

shall observe this holiday on the

date declared: December 5, 2018.

4. All essential employees shall

be issued floating holiday leave for

any hours worked on December 5,

2018, so that they may observe this

Day of Mourning on a day in the fu-

ture in accordance with county pol-

icies on floating holidays.

5. Officials may treat an em-

ployee as essential for less than the

full day and may allocate holiday

and floating holiday leave in pro-

portion to hours actually worked by

that employee.

6. Prior requests to use paid

leave on December 5, 2018, will be

amended to reflect this additional

allocation of holiday leave.

Chairman McMullen declared the

meeting adjourned at 4:11 P.M.

William McMullen, Chairman

Buffalo County Board

of Commissioners

ATTEST: Janice I. Giffin

Buffalo County Clerk

(SEAL)

ZNEZ D6,t1

PUBLIC NOTICE

REQUEST FOR PROPOSALS

 

The State of Nebraska, Depart-

ment of Administrative Services is

issuing this Request for Proposal

(RFP), 5983 Z1, for the purpose of

selecting a qualified contractor to

provide Transportation Services.

Copies of 5983 Z1 may be ob-

tained from the State Purchasing

Bureau website at:

http://das.nebraska.gov/

materiel/purchasing.html

A Pre-Proposal Conference will

be held on January 22, 2019 at

10:00 AM Central Time, at the Cen-

tral Nebraska Veterans Home, 4510

E 56th St., Kearney, NE 68847 in

Conference room J253.

Written questions are due no

later than January 15, 2019, and

should be submitted via e-mail to

as.materielpurchasing.nebra-

ska.gov, written questions may

also be sent by facsimile to

402-471-2089.

Sealed proposals must be re-

ceived in the State Purchasing Bu-

reau, 1526 K Street, Suite 130, Lin-

coln, NE 68508, on or before Feb-

ruary 12, 2019 at 2:00 pm Central

Time, at which time proposals will

be publicly opened.

ZNEZ D6,t1